Kohesio: discover EU projects in your region

   
more info
Start date: 1 September 2017
End date: 30 June 2023
Number of projects: 19
Total budget: 66 912 545,33 €
EU contribution: 33 456 272,64 €
Website: n/a
Country: European Commission Flag
Explore more: n/a
funds
ERDF: 32 956 213,42 €

1 - 15 of 19
PROJECTTOTAL BUDGETEU CONTRIBUTIONFUNDCONSTRUCTION OF A MADRID METRO GLOBAL CPD DATA PROCESSING CENTER IN CANILLEJAS 12 613 678,00 € 6 306 839,00 € ERDF IMPLEMENTATION OF SEVEN LIFTS IN THE COURT STATION OF THE MADRID METRO NETWORK.PARA ITS UNIVERSAL ACCESSIBILITY 9 353 176,00 € 4 676 588,00 € ERDF IMPLEMENTATION OF SIX LIFTS IN THE PRÍNCIPE DE VERGARA STATION OF THE MADRID METRO NETWORK 9 125 222,00 € 4 562 611,00 € ERDF RAILNET: RENOVATION INTEGRATED MULTISERVICE NETWORK (RIM) LINE 8 METRO. PROVISION AND INSTALLATION OF WIFI INFRASTRUCTURE FOR OPERATION IN 40 STATIONS AND SUPPLY OF NETWORK SWITCHES 6 571 486,00 € 3 285 743,00 € ERDF IMPLEMENTATION OF TWO LIFTS IN THE PORTAZGO STATION OF MADRID’S METRO NETWORK 6 524 008,50 € 3 262 004,20 € ERDF IMPLEMENTATION OF FIVE LIFTS IN THE ELLIPTICAL SQUARE STATION OF MADRID’S METRO NETWORK 4 745 103,50 € 2 372 551,80 € ERDF IMPLEMENTATION OF FOUR LIFTS IN THE MAIN RAILWAY STATION OF THE MADRID METRO NETWORK. 3 812 286,00 € 1 906 143,00 € ERDF IMPLEMENTATION OF SEVEN LIFTS IN THE BILBAO STATION OF MADRID’S METRO NETWORK FOR UNIVERSAL ACCESSIBILITY 3 778 898,00 € 1 889 449,00 € ERDF IMPLEMENTATION OF THREE LIFTS IN THE DISTRICT STATION OF THE CONCEPTION OF THE MADRID METRO NETWORK 3 197 436,20 € 1 598 718,10 € ERDF IMPLEMENTATION OF THREE LIFTS IN THE PAVONES STATION OF THE MADRID METRO NETWORK 2 235 780,20 € 1 117 890,10 € ERDF SUPPLY AND INSTALLATION OF SALES EQUIPMENT AND TOLLS AND SOFTWARE FOR THE E4.0 PROTOTYPE IN MADRID’S LARGE METRO STATION 1 482 633,90 € 741 316,94 € ERDF INSTALLATION OF TWO LIFTS IN THE PRÍNCIPE PIO STATION OF THE MADRID METRO NETWORK. 449 081,50 € 224 540,75 € ERDF SUPPLY AND INSTALLATION OF A DIGITAL INFORMATION SYSTEM WITH LED SCREENS IN MADRID’S METROPOLITAN STADIUM AND T1-T2-T3 METRO STATIONS 394 062,53 € 197 031,27 € ERDF SUPPLY AND INSTALLATION OF A DIGITAL INFORMATION SYSTEM WITH LED SCREENS IN MADRID’S METROPOLITAN STADIUM AND T1-T2-T3 METRO STATIONS 394 062,53 € 197 031,27 € ERDF SUPPLY AND INSTALLATION OF TFT SCREENS IN KAPSCH TRAFFICCOM TOLL CONTROL STEPS TO IMPROVE THE INTERFACE WITH MADRID METRO USER FOLLOWING THE MODEL OF STATION 4.0 305 886,69 € 152 943,34 € ERDF