Kohesio: discover EU projects in your region

project info
Start date: 14 March 2016
End date: 31 July 2018
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 278 240,15 €
EU contribution: 236 504,11 € (85%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa Lubuskiego
beneficiary
European Commission Topic

Thermal modernisation of educational facilities with the use of RES in Skąpe commune

The subject of the project is an investment in the infrastructure of the Fiedler Public High School in Radoszyn and the Janusz Korczak Public Primary School in Międzyles, which consists of thermomodernising buildings and improving their energy efficiency. The applicant and beneficiary of the project is the Municipality of Snake. The implementation of the project will in particular concern the following elements of supply and works: 1) Radoszyn High School: • thermomodernisation of stropod; • warming of the outer walls; • replacement of external windows; • installation of photovoltaic panels on the roof of the building under consideration; • modernisation of central heating system (c.o.) and hot water (c.w.u.) by: installation of a condensing gas boiler with automation; installation of an air/water heat pump; the installation of a capacitive water heater; installation of a heat exchanger; the adaptation of the sewage system; F) Reconstruction and adaptation of ventilation systems; reconstruction of the heating system (tubes and valves); the installation of weather automation; 2) Elementary school in Międzylesie: • thermomodernisation of stropod; • warming of the outer walls; • replacement of external windows; • installation of photovoltaic panels on the roof of the building under consideration; • modernisation of central heating system (c.o.) and hot water (c.w.u.) by: installation of a condensing gas boiler with automation; installation of an air/water heat pump; the installation of a capacitive water heater; installation of a heat exchanger; the adaptation of the sewage system; refurbishment of the heating system (tubes and valves); g) mounting of weather automation. In addition, the project will pay preparatory costs (related to the preparation of the Feasibility Study, natural inventory and preparation of project documentation and energy audits). The costs of investor and copyright supervision will be borne in the project management costs. Project

Flag of Poland  Zielonogórski, Poland