The aim of the project is to improve the energy efficiency of the public utility facility in the Gorzów Wielkopolskie area by optimising the energy economy of the building of the Construction and Automotive Schools Complex in Gorzów Wlkp. The following works are planned: performance of insulation of the exterior walls of the building with styrofoam, shower insulation of foundation walls and cellars with polyurethane foam system insulation, spraying roof – polyurethane foam, thermal insulation of the floor of the gym gymnasium floor with polyurethane insulation, modernisation of central heating system, installation of mechanical ventilation installation with cooling function, alteration of hole woodwork on the floor of the gymnasium for PVC and alteration of the vacuum system, the installation of mechanical ventilation system with the function of cooling, replacement of holes for PCV, and alteration of the hole for PCV. The project pursues the objectives of RPO 2020 in Axis 3. in line with the objective of Measure 3.2, which is the increased energy efficiency of buildings. The introduction of thermal modernisation improvements will lead to a reduction in energy demand for the buildings covered by the project by 1111083 kWh/year. As a result, emissions of major air pollutants and CO2 will be reduced, the air quality and living conditions of the MOF GW target group will be improved. The project is in line with the ZIT Strategy MOF GW.-PI 2.1, responding to the problems set out in OJ 2.1.1- increasing energy efficiency in public buildings in MOF GW, contributing to the achievement of output and result indicators specified therein. It continues its earlier projects, while demonstrating its potential for development. The effects of the project will affect the entire area of MOF GW. in terms of reducing pollution and providing improved community infrastructure from all functionally related gm[.