The aim of the project is to reduce the energy intensity of public buildings.For the realisation of the direct objective, the following will be done: School Team No. 13 in Gorzów Wlkp.: wall warming in the ground of 540.15 m², warming of the walls of cellars and pedestals above the ground – 244.23 m², warming of the above floor walls – 4386.65 m², warming of the full ceiling of 888.16 m², warming of the ventilated ceiling 2431.51 m², replacement of windows 1575.17 m², modernisation of installations and replacement of heating nodes, installation of mechanical ventilation with heat recovery, 28 m², modernisation of the inst. il. IV LO in Gorzów Wlkp.: window replacement: 54.85 m², replacement of fireflies 25.20 m², replacement of external doors.16.8 m², replacement of the attic door (for non-use section) 6.40 m², renovation of doors 18.20 m², walls in the ground 216.77 m², connector walls over the ground 824.96 m², ceiling of the last floor 843.94 m², roof bents 676.31 m², floor walls 204.00 m², replacement of the existing installation. — ventilation and ventilation unit, exchange of lighting for energy efficient – all rooms will be illuminated with LED lighting. The project will reduce the energy intensity of educational buildings by about 50 %. Expected indicators: 1. Result and product: — Estimated annual reductions in greenhouse gas emissions (CI 34) to 965 tonnes of CO2 equivalent/year; — Reduction of annual primary energy consumption in public buildings (CI 32)-2894309 kWh/year; — Number of energy-upgraded buildings – 2 pieces. — Number of maintained jobs 0 FTE, 2. Specific: Project share in the area covered by the revitalisation programme – 0,28 %. Benef. End: residents of MOFGW, institutions, businesses, pupils, teachers and other school employees covered by the project. As of 2016, the number for ZS No. 13 is about 1700 people, for IV LO approx.