Project for deep thermomodernisation of the building. utility publ. in the building of Zabor, including the building: Municipal Office, School Complex, kindergarten – in Zabor and the Rural Culture Centre in Droszków. The investment consists of modern. and warming of partitions (walls and ceilings in UG Zabor, ZS Zabor, kindergarten Zabor; warming of the ceiling in CK Droszków, replacing the carpentry (windows and entrance doors in ZS Zabor, entrance doors in CK Droszków), modern. heat sources (change of heat source in UG Zabor, ZS Zabor, kindergarten Zabor – replacement of the old boiler for biomass for a system: heat pump air water and supporting gas boiler; in the building CK Droszków – coal boiler. for gas boiler), modern. internal networks. And CWU. A monitoring and energy management system based on information-communication technologies (ICT) will be installed in 4 buildings; photovoltaic installations supporting heat pumps (RES – solar energy, in buildings of EMU, ZS and kindergarten). It’s a location. The project: Selection, Gm. Acquisition (MOF ZG) Target: It’s a bellow. GM. Acquisition and MOF Zielona Góra, Building Users, Gm. Board, Environmental Protection System Inst. Main Objective: improving energy efficiency in the public buildings sector in the Municipality of Zabor by optimising the energy economy in buildings: Municipal Office in Zabor, School Complex in Zabor, kindergarten in Zabor, Rural Culture Centre in Droszków. Within the project, indicators are planned: 1. Products: Zmodern. energ. buildings: 4 pcs; one heat energy from RES: 3 pcs; construction of one electric energy from RES: 3 pcs; Zmodern. fodder of heat: 4 Pc.; I'm sorry. It’s a utility. Bud. Thermomodern. 6 143,87 sqm 2. Results: decrease in CO2 emissions (CI 34): 43,76 MgCO2/year; The increase in the heat. (e.g. rather than forewords). — 0 FTES; I'm Reduk. Ener. heat: 1880,60 GJ/year; It’s a prod. I'm ENER. Elektr. from new RES: 0,112 MWhe/year; Reduce EP consumption in pub buildings. (CI 32): 2100 kWh/year; Reduce end energy consumption: 2029.28 GJ/year The period of implementation of the project covers the years 18.05.2015-30.06.20