Kohesio: discover EU projects in your region

project info
Start date: 1 October 2018
End date: 15 December 2019
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 436 439,59 €
EU contribution: 288 990,00 € (66,22%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa Lubuskiego
intervention field
beneficiary
European Commission Topic

DEVELOPMENT OF ECOLOGICAL TRANSPORT IN KŁODAWA COMMUNE THROUGH THE CONSTRUCTION OF CYCLE PATHS – STAGE II KŁODAWA – WOJCIESZYCE – DK NR 22

The project will be implemented in Kłodawa, along the county road No. 1406 F -na odc. Kłodawa-Wocieszyce-DK No. 22. There are currently no bicycle paths or separate cycle lanes. The technical condition of the side poses a threat to traffic participants, especially pedestrians and cyclists. The aim of the project is to create the conditions for safe and seamless use of alternative (non-emission) means of transport within the MOF GW. Objectives of the project: — Construction of a bicycle path in the Kłodawa district acting as a transport corridor on the Kłodawa-Wocieszyce-DK section no. 22. — Reducing low emissions of pollutants from the transport sector in G.Kłodawa by creating optimal conditions for the development of green transport. — Improving conditions and increasing the quality of life of residents of MOF Gorzowa Wlkp. — Increasing the competitiveness of the economy of MOF GW and the sustainable development of the Lubuskie region. It is planned to build a path with asphalt pavement and concrete cube, which as a transport corridor will, among other things, facilitate access to work establishments. The project fits into the 2 goal of development. ZIT MOF GW Strategy, Unit. 2.1.2 – fills the product “long-built roads for bicycles” by 4.47 km and the result of the “estimated annual reduction in gas emissions (...)” by 10.53 tonnes of CO2/year. The target group of the project is the inhabitants of MOF GW. The project affects the whole area of MOF GW (e.g. in terms of reducing low pollution emissions.-szcz. SW p. 70. WN. has complete technical documentation, SW, necessary opinions and arrangements, PGN as well as resources and experience to carry out the project. The scope of the project does not qualify it for an EIA obligation. The following output and result indicators will be achieved: L. supported bicycle infrastructure-4.47 km, L. facilities adapted to the needs of people with disabilities. — 1 pcs. Estimated annual decrease in greenhouse gas emissions.-10.53 tonnes of equilibrium. CO2

Flag of Poland  Gorzowski, Poland