Start date: 25 November 2014
End date: 15 September 2023
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 19 779 912,00 €
EU contribution: 16 001 788,00 € (80,9%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Lubuskiego

Construction of the bridge over the Oder River with the construction of a new route of the Voivodeship Road No. 282 – Stage II

The project consists of building a bridge over the Oder River (ca. 380 m) together with the construction of Voivodeship Road No. 282 after a new track with a total length of approx. 9.2 km from Łaz to Bojadła, as well as reconstruction of the existing DW 282 in the place of incorporation and intersection with the newly built road. The purpose of the investment is to ensure an efficient, safe, year-round and environmentally friendly journey through the DW 282. The measles. The investment will be implemented in the “design and build” mode, hence the assumptions adopted may change. It is planned to design a Class G road with a permissible axle load of 115 kN, a one-way, two-lane road with a width of approx. 7.00 m with two-sided groundsides with a width of approx. 1.25 m. It is also planned to: • construction of 2 farm crossings under the crown of the road, • construction of a bridge facility over a row. The Smiga; • construction of 2 crosses. circular motion; • construction of 2 crosses. scanned; • construction of bicycle infrastructure; • construction of road culverts; • the construction of additional roadways with decays; • execution of non-movement devices; • dehydration of the road and bridge; • removal of collisions with existing technical infrastructure; The project has an impact on increasing traffic free: includes elements separating local traffic from transit traffic (road to local traffic), segregation of traffic from the main road, construction of junctions, limitation of availability to DW 282 through main intersections, construction of foot-bike lines, construction of exits, construction of lighting, construction of barriers and rails, point retro-reflecting elements (PEO), active signs, weather station, weighing stations of vehicles. The main objective of the project, in line with the objective of action 5.1.1. RPO Lubuskie 2020, is improved external and internal transport accessibility of the region in road traffic. Direct objectives: — Increasing transport accessibility, including connection to the TEN-T network, – Increasing the quality of road infrastructure, – Improving security

Flag of Poland  Zielonogórski, Poland