The project includes demolition and construction of a new bridge, along with a touring bridge through the district of Skwierzyna in the area of demolition and construction of spans, intermediate supports and bridgeheads, planned support and construction of the building of the building in the field of construction, construction of the bridge and construction of the bridge in the field of works. The overarching aim of the project is to improve accessibility to motorways and expressways by increasing the standard and quality of the road network of voivodships and BRDs. The implementation of the project will contribute to strengthening the coherence of the Polish transp. network with the transp. systems of the EU countries, ensuring the geographical cohesion of the country and individual regions with the European space. As a result of the investment, it is planned to achieve the following objectives: • facilitated accessibility to the main transport routes, especially to the A2 motorway and the S3 express road • good technical condition of the bridge in m.Skwierzyn during road No. 159, • b. good technical condition of the road, reducing excessive fuel consumption, noise and exhaust emissions, • improvement of pedestrian safety by securing pedestrian traffic by railing on the edge of the pavement and slopes on the bridge, • adequate transverse decreases and equality in the transverse and equatorial direction. 159 – b. Good condition of the nave on the bridge – shortening of the journey time. The project’s stakeholders are: residents of the support area – G. Skwierzyna, Miedzyrzeckiego Pow., Woj. Lubuski; the traders; public bodies; non-governmental organisations; State and local authorities; users of public roads