The project includes the construction of the second stage of the Drezdenko bypass during DW 160 and 181. 1.84 km along with the construction of roundabouts, lighting, farm crossings, animal crossings, rainwater drainage, walking-bike at the roundabout, making acoustic screens and reconstructing collisions with foreign devices. The bypass will bring transit traffic from the city centre, which will improve traffic in the city and improve safety. The overarching objective of the project is to improve accessibility to motorways and expressways by increasing the standard and quality of the road network of voivodships and BRDs. The implementation of the project will contribute to strengthening the coherence of the Polish transport network with the transport systems of the EU countries, ensuring the economic and spatial cohesion of the country and individual regions with the European space. As a result of the construction of the Drezdenko bypass (stage II), it is planned to achieve the following objectives in the course of DW 160 and 181: • facilitated accessibility to the main transport routes, especially the A2 motorway and the S3 expressway • expensive bypass of Drezdenko – transfer of transit traffic outside the city centre, • improving the state of techn. road in m. Drezdenko, lower load and fuel consumption, lower noise and exhaust emissions, • reduction of harmful emissions of pollutants with exhaust gases, noise and vibration by transporting the town by transporting the town, • increasing the attractiveness of investment and economic activity in the region. residents of the support area – Drezdenko, shotgun-drezdenecki, Lubuskie Voivodeship, entrepreneurs, public institutions, NGOs, state and local authorities, all users of public roads. According to [...]