The project Reconstruction of Kostrzyńska Street results from the implementation of the ZIT MOF Strategy Gorzów Wlkp. and has been identified as a key project intended to be implemented as part of the non-competition procedure under measure 5.1.2 RPO – Lubuskie 2020.It is part of the reconstruction of the road system and refers through its location to the infrastructure of collective and rail transport. It consists of rebuilding the street. Kostrzyńska in Gorzów Wielkopolski on the section approx. 1900 m – from the intersection with Plac Słoneczny Street to the intersection with Dobra Street and renovation of ul. It is located on the section of approx. 1109 m – from the intersection with ul. Good for junction with S3 node. It fully implements the target communication solution. Once completed, the road will be fully exploited and accessible to all road users. It is complementary to the “Sustainable Urban Transport System in Gorzów Wlkp.”, which is included in the list of projects identified under the out-of-competition mode under numbers 6.1-33.1. You know, I'm sorry. The following actions will be carried out as part of the project: 1. Preparatory work 2. Construction work 3. Contract engineer 4. Authorship 5. Buy out land 6. Promotion of the project Provides the implementation of environmental protection measures during the implementation of the project (day work, segregation and ongoing removal of waste from construction, reduction of dust emissions). Activities minimising the impact on natural elements (i.e. tree cutting limited to a minimum, outside the breeding period, work in the vicinity of vegetation with special care, will be carried out replacement plantings). Measures will be taken to mitigate the impact of investment on the environment through, among others, the construction of rainwater drainage or replacement plantings. Rainwaters will be included in leak-proof sewage systems ending with a separator of petroleum-derived substances. The scope of work related to the BRD elements is foreseen.