Kohesio: discover EU projects in your region

project info
Start date: 29 December 2014
End date: 30 November 2018
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 2 302 197,75 €
EU contribution: 1 956 868,09 € (85%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa Łódzkiego, obsługiwany przez: Departament Polityki Regionalnej, Departament ds. Regionalnego Programu Operacyjnego, Departament Finansów, Departament Europejskiego Funduszu Społecznego, Departament Promocji
European Commission Topic

CONSTRUCTION OF A LOCAL ROAD WITH THE NECESSARY TECHNICAL INFRASTRUCTURE TO OPEN INVESTMENT AREAS, LOCATED IN TOMASZÓW MAZOWIECKI AND TOMASZÓW MAZOWIECKI COMMUNE, CONNECTING EXPRESSWAY NO. 8 AS PART OF THE TEN-T NETWORK

OBJECTIVE: IMPROVING TRANSPORT ACCESSIBILITY OF WARS. ŁÓDŹ, THROUGH THE CONSTRUCTION OF A LOCAL ROAD CONNECTING EXPRESSWAY NO. 8, WHICH IS PART OF THE TENT NETWORK, TAKING INTO ACCOUNT THE PRINCIPLES OF SUSTAINABLE ECONOMIC AND SOCIAL DEVELOPMENT. IT’S A DEBT. IT’S THE FRONT. A DISTANCE OF 2.38 KM. AS A RESULT OF THE PROJECT IMPLEMENTATION. THE FOLLOWING WILL BE: IMPROVING THE SAFETY OF ROAD AND PEDESTRIAN TRAFFIC, IMPROVING THE LINKS OF THE REGIONAL ROAD NETWORK. LODZ WITH THE NETWORK OF NATIONAL ROADS AND THE TRANS-EUROPEAN TRANSPORT NETWORK TEN-T, IMPROVING ACCESSIBILITY TO THE AREAS OF INVESTMENT., LIMITING THE NEGATIVE IMPACT OF ROAD INFRASTRUCTURE ON THE STATE AND QUALITY OF THE ENVIRONMENT. IMPLEMENTATION OF THE PROJECT. IT WILL PROVIDE A SIGNIFICANT IMPROVEMENT IN LIVING CONDITIONS IN THE AREA AND WILL HAVE A POSITIVE IMPACT ON THE WHOLE REGION IN TERMS OF: CREATING CONDITIONS FOR ECONOMIC DEVELOPMENT, INCREASING INVESTMENT ATTRACTIVENESS OF THE VOIVODSHIPS. LODZ, LIMITING DEVELOPMENT IMBALANCES. TASKS: IT’S THE ASS. 1 PREPARATION OF THE PROJECT – TECHNICAL DOCUMENTATION., SW. IT’S THE ASS. 2 CONSTRUCTION WORKS – ROAD INDUSTRY – ACCESS ROAD, ENGINEERING FACILITIES (BRIDGE OF CULVERTS), SECURITY EQUIPMENT WEDNESDAY, AMP. TRAFFIC, TREE CUTTING, SERVICE DOCTOR, (NIEKWALIF. INTEGRATION OF THE ROAD INTO THE JUNCTION S8 – GM. TMAZ., GM. M. TMAZ. SANITARY INDUSTRY – RAINWATER DRAINAGE, STORAGE TANK, PROTECTION OVER THE GAS PIPELINE (NOKWALIF. — A SEWER. IT’S RAINING. ON SWITCHING IN S8 – GM. TMAZ, CHANNEL. SANITARY, WATER SUPPLY, VAT ON THE SEWER. IT’S RAINY. — GM.M. TMAZ.) POWER INDUSTRY – STREET LIGHTING, REMOVAL OF COLLISIONS OF 15KV AND NN NETWORKS WITH THE ROAD (NIEKWALIF. — RECONSTRUCTION OF 15KV LINE, POWER SUPPLY OF SEWAGE PRESSING PLANTS, POWER TO TER. IT’S AN INVEST. ULICZ.NA SWITCHED ON IN S8 – GM.TMAZ., POWER SUPPLY OF THE PRESSING PLANT – GM.M. TMAZ. 3 PROJECT MANAGEMENT – INVESTOR SUPERVISION. IT’S COPYRIGHT SUPERVISION. PROMOTION OF THE PROJECT. (INFORMATION AND PROMOTIONAL TABLES, A.K.A. IN THE LOCAL PRESS). TARGET GROUPS: ALL USERS USING BUILT-IN ROAD INFRASTRUCTURE: RESIDENTS OF G AND M. TM., COUNTY TOMASZ., TOURISTS, ENTER

Flag of Poland  Piotrkowski, Poland