The aim of the project is to increase the share of renewable energy in the country’s energy balance. The aim of the project is also to further develop the applicant’s economic activity consisting of the production of green electricity through wind. The target group in the project is all residents of the country benefiting from the environmental element of clean air. Through the implementation of the project in the Łódź Voivodeship, it will be used by inhabitants of the voivodship, who will live in the environment of cleaner air by increasing the extraction of energy from RES in the voivodship. In addition, the clean energy produced by the project will be sold to the electricity grid and will then have access to it by all residents of the country. The object of the project is the construction of a wind power plant (1 pieces) together with the purchase of materials, construction and earth works, as well as the purchase of electrical materials and works. The project will include a wind power plant consisting of one turbine with a maximum capacity of 800 kW (a medium-power turbine) with the power of installed 800 kW generation units. The height of the mast (the fifth) is 73 m. The diameter of the rotor is 53 m. In addition, the project assumes the purchase of materials and earthworks and construction works necessary for wind farm construction. This work will include the construction of a road, a manoeuvring area and a reinforced concrete foundation. The project also involves the purchase of materials and electrical works, which will include the execution of an underground cable line of average voltage of 15 kV and a container with measuring and settlement system