project info
Start date: 1 July 2019
End date: 30 April 2020
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 950 949,19 €
EU contribution: 703 702,40 € (74%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Łódzkiego, obsługiwany przez: Departament Polityki Regionalnej, Departament ds. Regionalnego Programu Operacyjnego, Departament Finansów, Departament Europejskiego Funduszu Społecznego, Departament Promocji
intervention field

CONSTRUCTION OF WIND POWER PLANT EW10 -ENERCON E53 WITHIN THE REGISTRATION AREA OF OLD RED, GM. GELCHLINEK ON PLOTS 404,405,406,407,408

The scope of the project includes the construction of a wind farm (0.80 MW turbine) with connection to the SN network, cable line and accompanying infrastructure (including access roads, manoeuvring area) and project promotion. Power installed in the project (0.80 MW), the amount of energy generated in the project (1490.00 MWh/year). Net value of the material scope – 5616500,00 of which qualified edition – PLN 4277774.12, subsidy PLN 3165552,85. The objectives of the project are in line with the strategic objectives of the development of the region and the objectives of the low-carbon economy, including, above all, increased production of renewable energies and reducing CO2 and other gases, increasing the level of environmental protection. The 0.80 MW wind turbine will be connected to the existing operator’s network. The infrastructure manager (the applicant) under the contract with the operator will supply the generated energy to the grid in its entirety. The aim of the project is to build oze installations and produce energy from renewable sources, reduce CO2 emissions, increase the use of RES in energy production, move to a low carbon economy and reduce the share of conventional energy. The objectives of the project reflect the needs of stakeholders and have been defined by measurable indicators in accordance with the objectives of ROP WŁ 2014-2020 (product and result indicators). Implementation of the project includes the stage of selection of contractors, construction and operation (within 3 years from the date of final payment). The project provides emission reductions (avoided emissions – new installation) to meet strategic objectives by producing energy from RES (compatibility with SZOOP). The project retains the principles of the universal design concept (care for project effects as much as possible for all project stakeholders). Target group of the project – applicant, residents of the region. Status of the applicant’s enterprise (SMEs). The applicant entitled to receive support. A project compatible with the state aid rules.

Flag of Poland  Piotrkowski, Poland