THE MAIN OBJECTIVE OF THE PROJECT IS TO: IMPROVE ENERGY EFFICIENCY IN THE PUBLIC SECTOR THROUGH THE THERMAL MODERNISATION OF 70 EDUCATIONAL BUILDINGS IN BOATS. THE PROJECT WILL BE IMPLEMENTED IN M. BOAT. THE TARGET GROUP OF THE PROJECT IS PUPILS AND SCHOOL WORKERS (21 416 PEOPLE) AND INDIRECTLY ALL RESIDENTS. THE PROJECT’S MATERIAL SCOPE INCLUDES: WARMING OF THE OUTER WALLS., WALL WARMING PART. PIWNICZNA, FOUNDATION WALLS, STROPODACHE, CEILINGS LAST. FLOORS, REPLACEMENT OF WINDOWS, EXCHANGE OF LUXPHERES FOR WINDOWS, REPLACEMENT OF DOORS, MODERNISATION OF HEATING SYSTEM (C.O. INSTALLATION IN TERMS OF IMPROVEMENT OF INSULATION, E.G. RADIATORS, USE OF THERMOSTATS AND UPHOLSTERY VALVES), MODERNISATION OF INTERNAL LIGHTING, OUTLAYS INCLUDE CARRYING OUT NECESSARY ACCOMPANYING WORKS. THE PROJECT HAS BEEN DEVELOPED FOR THE PURPOSE OF IMPLEMENTING THE PROJECT. PROJECT DOCUMENTATION AND ENERGY AUDITS. THERE ARE NO RISKS TO THE IMPLEMENTATION OF THE PROJECT: THE CITY HAS REGULATED PROPERTY ISSUES (BUILDINGS, LAND IS OWNED BY THE CITY), THE CITY HAS EXPERIENCE IN THE IMPLEMENTATION OF EU PROJECTS WITH STAFF, FUNDS TO COVER ITS OWN CONTRIBUTION WILL BE SECURED IN THE CITY BUDGET. THE PROJECT HAS WELL-STRUCTURED ASSESSMENT INDICATORS AND WILL HAVE SIGNIFICANT LONG-TERM IMPACTS ON THE REGION: PRODUCTS: — NUMBER OF ENERGY-EFFICIENT BUILDINGS: 70 PCS; — USABLE AREA OF BUILDINGS UNDERGOING THERMAL MODERNISATION: 194 825,28 M2. RESULTS: — THE ESTIMATED ANNUAL DECREASE IN GREENHOUSE GAS EMISSIONS: 12 656,92 T CO2/ROK EQUIVALENT; — REDUCTION OF ANNUAL CONSUMPTION. PRIMARY ENERGY IN PUBLIC BUILDINGS: 33 308 997,03 KWH/YEAR; — REDUCTION OF FINAL ENERGY CONSUMPTION IN WYN. IMPLEMENTATION OF PROJECTS: 451,15 [GJ/YEAR]. THE PROJECT IS COMPLEX. THE IMPROVEMENT IN ENERGY EFFICIENCY FOR INITIAL STANDING WAS CALCULATED AT 62.27 % (FOR INDIVIDUAL BUILDINGS: LISTED IN THE FEASIBILITY STUDY ON PAGE 47-48) ALL BUILDINGS ARE CONNECTED TO THE LOCAL HEATING NETWORK. THE PROJECT IS