OBJECTIVE: IMPROVING THE SITUATION IN TERMS OF THE QUALITY OF VOCATIONAL AND CONTINUING TRAINING BY INCREASING ACCESS TO HIGH QUALITY VOCATIONAL EDUCATION IN THE SCHOOL TEAM IN ZDUŃSKA WILL – KARSZNICE. TASKS: PODST.ELEMENT OF THE PROJECT IS THE EXPANSION OF THE SCHOOL COMPLEX IN ZDUŃSKA WILL BY ADDING TO THE EXISTING INFRASTRUCTURE A BUILDING, WHERE THERE WILL BE 3 TEACHING ROOMS FOR THE NEEDS OF THE STUDENTs’ CLASSROOMS OF THE HIGH SCHOOL WITH PROF.: HOTEL, CATERING AND TRAIN AND FURNISHINGS TO THESE ROOMS. IN ADDITION, AN EXTERNAL STATE WILL BE MADE. DYDAKT.: TRACK WITH DOUBLE TRACK CROSSOVER – LENGTH 60 M. PROJ. THE FACILITY WILL BE CONNECTED TO THE EXISTING SCHOOL-TEACHER BUILDING, WHERE THE BOILER ROOM WILL BE LOCATED, BASED ON GROUND HEAT PUMPS. AN INTEGRAL PART OF THE PROJECT WILL BE THE CONSTRUCTION OF NECESSARY ELEMENTS OF THE BUILDING’S OPERATION, INCLUDING ROADS AND PARKING LOTS. IN THE BUILDING YOU WILL FIND: IT’S A JOB. RAILWAY (EQUIPPED WITH STANDARD TEACHING EQUIPMENT: CHAIRS, PLATES AND PROFESSIONAL TRAINING EQUIPMENT: RAILWAY CLOCKS, TOROMIERS, PROFILOMIERS, TELEPHONE CONTROL PANELS – DISPATCHERS, COMP. FROM OPROGR. FOR DRAWING STATION DIAGRAMS, MODELS, FOLIOGRAMS, TRANSPARENTS, MOCK-UPS, CASH REGISTERS AND EXTERNALS. A TEACHING POST), WORKS. HOTEL (FULLY EQUIPPED STATIONS: HOTEL RECEPTION, RESIDENTIAL UNIT, SANITARY AND SANITARY NODES, FACILITIES/STORAGE ROOM AND CONFERENCE ROOM) AND WORKS. “REFRESHMENT”. BREAKFAST PREPARATIONS AND EXPEDITIONS, 4 EXAMINATION STATIONS, EQUIPPED WITH M.IN. KITCHEN HOODS, WARDROBES, EDITORIAL TABLES, GAS KITCHENS, DISHWASHER). DIRECT TARGET GROUP: STUDENTS OF THE SCHOOL TEAM IN KARSZNICE – CURRENTLY 320 PEOPLE, INCLUDING 215 STUDENTS OF THE HIGH SCHOOL. INTERMEDIATE TARGET GROUP: RESIDENTS OF POT. ZDUŃSKOWOLSKI AND ALL THOSE WISHING TO STUDY IN THE SCHOOL TEAM. ANOTHER TARGET GROUP WILL BE THOSE SEEKING QUALIFIED WORKERS.