project info
Start date: 10 June 2016
End date: 30 June 2020
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 1 687 851,87 €
EU contribution: 1 350 281,50 € (80%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa obsługiwany przez Urząd Marszałkowski
intervention field
beneficiary
European Commission Topic

ECO – EFFECTIVE MUNICIPALITY OF GERMANY – STAGE IV

The project (P.) assumes the installation of 611 pcs. set of photo cells. 115 pieces. — 2.08 kW, 128pieces-2.6 kW, 72 pieces-3.12 kW,76pcs-3.64 kW,210pieces-4.16 kW,10pieces-5.2 kW) in private objects for the production of electricity planted on walls or roofs and 72 pieces for biomass (29pieces- 15 kW, 43 pieces-25 kW). P. also provides for the design and execution of the Internet portal, which will perform educational functions, ferry and offer on-line services. Total number of bellows. GN benefiting (target GRUPA) from the results of the implementation of P. will amount to approx. 3000 in 683 subject. HEADS, HEADS, HEADS. The purpose of P. is to increase. pile. RES in the GN area. The objectives of the detail: OBJECTIVE 1: Upgrade the technology of producing clean energy among inhabitants. through the general assembly of RES on the premises of the building; OBJECTIVE 2: Reducing air pollution. Atmosf. by reducing greenhouse gas emissions to the atmosphere; OBJECTIVE 3: Reduce the loads finan. incumbent by using energy RES;REZULTATY: Additional renewable energy generation capacity of 3,51 MW(PV-1.989 MW,piece-1.51 MW), Estimated annual reduction in greenhouse gas emissions – 1005,68tCO2/year, The production of heat from newly built/new RES-based installations – 507,50 MWht/year. Production of electricity from newly built/new RES installations- 2237,19Mwhe/year. Number of built units of electricity generation from RES – 684pcs. P. contributes to both the priority objective. 4 and target of the main RPO WL. P., alongside social benefits and gossip, will influence more effective action against climate change. P. shall be included in the operational objectives (2.5.; 3.6; 4.5) indication. in SRWL 2014-2020. On the basis of the PROGRAM OF THE PARTICULAR FOR the Lublin STREFA, GN did not exceed even one permissible or target level for substances subject to air quality assessment

Flag of Poland  Lubelski, Poland