Kohesio: discover EU projects in your region

project info
Start date: 14 September 2016
End date: 29 February 2020
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 451 631,18 €
EU contribution: 383 886,50 € (85%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa obsługiwany przez Urząd Marszałkowski
beneficiary
European Commission Topic

THERMAL MODERNISATION OF PUBLIC BUILDINGS LOCATED IN THE MUNICIPALITY OF NIEMCE

It’s a target. Głów. p. is improving the efficiency of energy use in 3 public buildings located in the municipality of Germany. The scope of the work includes, among others: renovation and warming of the roof, ceiling, warming of external walls; flooring; replacement of window carpentry and Luxury, door; installation of vents, lightning protection; photovoltaic inst.; replacement of central heating and hot water installations; inst. lighting, installation of measuring systems. costs non-equipment. —assembly of gas boilers, gas inst. for boilers, gas detection. Tasks in the project: Thermal modernisation robots – GOPS Germany, Thermomodernisation robots – UG Germany, Thermomodernisation robots – ZS Krasienin, Technical Documentation, Energy Audits, SW, Investor supervision, Information and Promotional Campaign. The following indicators will be achieved under p.: Prod.: Number of modernisations en. bud.-3; Number of built one electric energy output-3; Usable surface of buildings subjected to heat. — 3474,9 m²; Additional RES generation capacity (CI30) – 0,02 MW; Additional RES electric capacity – 0,02MWe; The result.: Amount of thermal energy saved – 1 186,70 GJ/year; Reduction of annual consumption en. first in the building publ. (CI32) – 406523 kWh/year; Estimated annual decrease in heat gas emissions. (CI34) -121.53 tons/year, Number of saved en. electr. — 48,25 MWh/year. Bring it down. It’s a year. Energy consumption first. in the publ. (CI32) – 406523,35 kWh/year. Electricity production from newly built/new installed capacity will be used. RES – 16,4 MWhe/year. Target groups p.: residents of the GN using the services of the facilities in question. On the subst. IT’S A PROGR. IT’S OCHR. For STREFY LUBELS.J in GN, there was no cross-section of at least one level or target for substances subject to air quality assessment. Section. provided for in P. will be used for the implementation of repair activities aimed at increasing the air quality status through PM10 emissions from the heating system.

Flag of Poland  Lubelski, Poland