The project “Installation of renewable energy systems in the Ciechanów City, Glinojeck Municipality, the Municipality of Opinogóra Górna and the Municipality of Strzegowo” aims to increase the share of renewable energy sources in the total energy production by assembling 571 installations for the production and distribution of renewable energy in the Mazowieckie Voivodeship in the period until 31.12.2017. The project plans to install 354 units of photovoltaic panel installation, 128 solar collector installations, 88 CWU heat pumps and 1 chargers for electric cars for the distribution of electricity. The project will be implemented by the applicant and three partners – G.Glinojeck, G. Opinogóra Górna and G. Strzegowo – on the basis of a signed partnership agreement. The area of implementation of the project covers rural and urban areas. The project is an umbrella project (created energy used only for own purposes), as planned RES installations will be installed on the properties of individual residents (444 households) and on public buildings or their surroundings – 16 buildings, ensuring an environmental effect by increasing the share of renewable energy in consumption (dispersed energy). The project combines infrastructure investments for obtaining energy with RES with information and promotion activities related to environmental education, e.g. articles, educational meetings, conferences. The implementation of the project will contribute to reducing atmospheric emissions and improving the health conditions of the project recipients by reducing CO2 emissions per year by at least 1229.1 t/year by 31.12.2018. The project is implemented in the formula design and build.