The project covers the construction of bicycle paths and foot-bike tracks in the municipality of Izabelin together with accompanying infrastructure. The subject of the project is: — Construction of new sections of bicycle paths and walking-bike tracks within 3 Maja Streets (from Mościsk to Truskaw) and Sierakowska, with a total length of 6444 m, – Reconstruction of existing walkways to bicycles, – Construction of a parking lot for bicycles in the interchange area for public transport, in Mościska, at the intersection of ul. Stage and St. 3 May, – Installation of bicycle infrastructure elements such as: stands, bicycle stands, bicycle service places, level difference. — Construction of an integrated interchange node. The above elements are directly connected functionally and directly achieve the project objectives. In addition, the paths will include elements of common (single) marking of cycle routes for WOFs. The project also covers promotion and information activities in accordance with the information obligations of the beneficiary implementing the project under the ROP WM for the years 2014-2020. The cycle paths covered by the project serve as transport corridors and are designed for the purposes of: —increased use of non-motorised transport, -reducing the use of passenger cars, -better integration of transport modes, lower emissions of air pollutants, noise and lower congestion, – improving road safety, – were not designed only as tourism and recreational infrastructure. The direct target group of the project is the inhabitants of the commune of Izabelin of working age commuting daily to work. Indirectly, the project is aimed at all residents of the municipality who make compulsory or optional travel by car. The project will also be aimed at other WOF residents wishing to reach KPN and its location