Start date: 1 July 2016
End date: 30 August 2019
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 3 863 574,00 €
EU contribution: 2 318 144,40 € (60%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa Mazowieckiego
European Commission Topic

“Expansion and reconstruction of roadways Przemysłowa, Kostrogaj and Wiadukt in Płock together with the necessary infrastructure to make investment areas available in the Łukasiewicza and Trzepowo estates”

The project covers 3 tasks. The sections of the projected roads constitute a single road line with the same number – Poviat Route No 5215 W. The project meets the terms of the Partnership Agreement – provides direct connections to freight terminals, centres or logistics platforms and existing and new investment areas. Main objective – Improving the coherence of the regional road network with the TEN-T network and increasing the availability of the internal and external city of Płock and its functional area by adapting the communication system to the needs of users. The project is included in the Investment Plan for the Płock subregion covered by the problem OSI – Functional Area of the City of Płock. It responds to the problems and needs regarding the communication accessibility of the Płock subregion as defined in the National Strategy Papers (NPBRD 2013-2020 – pillar “Safe Roads”) and regional (SRWM up to 2030 Innovative Mazowsze). The project provides for safety elements for road traffic: islands draining traffic, bilateral hiking, cycling paths, bus stops, pedestrian crossings with asylums, traffic lights. THE DOCEL GROUP.: entrepreneurs and their contractors, potential investors, residents of Płock and functional area, all present and future users. The analysis carried out confirms the financial, organisational, technical and technological feasibility. Project costs have been estimated in an appropriate amount. The most economically and technically advantageous solutions have been chosen. The assumptions made will allow the planned indicators to be achieved. The construction works will be carried out under the 1 contract. The applicant shall be able to maintain project effects over a long period of time. The risk analysis did not reveal events that could interfere with the implementation of the investment. The only threat is that we don't get funding from Wednesday. ERDF, which will reduce or abandon investment.

Flag of Poland  Płocki, Poland