“Construction of the Gąbin ring road within the Voivodeship Road No. 577 of the Łąck – Ruszki relations in Gąbin”

This project includes the construction of the Gąbin bypass after a new footprint, along the Voivodeship Road No. 577 of the Łąck-Ruszki relationship. The project includes the construction of a 4595 m long bypass after a new track, with a system of intersections, service roads, rain drainage, drainage ditches, pedestrian pavements, bicycle paths, foot and bicycle tracks and technical infrastructure. The bypass will constitute a new section of voivodship road No. 577 in km 9 + 000-13+ 595. According to the land management project prepared for the project, the bypass will be built between the points in the trail of DW 577: from km 9+ 000 (existing provincial route no. 577) to km 12+ 750 (existing provincial route no. 577). The investment will be located in the Mazowieckie Voivodeship, Płockie County, Gąbin Municipality. It will be a new section of the Voivodeship Road No. 577 in km 9 + 000-13+ 595. A two-way, two-way, G-class road has been designed

Flag of Poland  Płocki, Poland