The subject of the project is the construction of road and network infrastructure for the functioning of the Economic Activity ZonePiaskówka Komunalna.1.Total area of SAG Piaskówka 5.95 ha, including investment plots 4.77 ha2.Total area of SAG Municipal 12.91 ha, including investment plots 12.13 ha2. In both cases, the SAG road system will be implemented with its inclusion in urban roads. Roads will be equipped with pavements, dehydration, in both cases for storage tanks, exits to investment plots and lighting. Roads will be public communal roads. The sagas will be equipped with networks: water and sewerage and technological channels for the location of electrical, gas and teletechnical supply lines. As part of the ineligible costs, both areas will be grubbed up medium and high greens, and land levelling will be carried out. Thus, both zones will be fully equipped SAG. The subject of the investment is the implementation of the infrastructure which will be used to handle SAG. It includes for SAG Sands construction:streets inside zone 656 mb of pedestrians790 bike mbdraws720 mbsciding three-intake2 manoeuvring areas 20mx20mm of waterworks with a length of approx.600 m of sewage network with a length of approx.600 m of street lighting network with a length of approx.650 sqm of technology sewerage network length approx.650 m of rainwater drainage network. 600 m and 2 retention tanks Reconstruction of the existing network infrastructure for SAG Municipal construction: road length. 0.31 km of footlift long. 0.28 km8 downhills publ. with manoeuvring culverts 20mx20mm of road lighting network LED water supply length approx. 250 mcs of sewerage network approx. 250 m of technological canal approx. 350 mnet of rainwater drainage approx. 330 m with retention tank Reconstruction of the existing network infrastructurec.d.description in point. Q