The project plans to finance the replacement of 193 old coal boilers, the installation of 193 modern boilers burning solid fuels, the installation of 1 solar collectors.The condition of the grant will be to subject the building to an energy audit, which will indicate whether there is a need for the building to undergo energy modernisation. The obligation of inhabitant to meet the requirements of thermomodernisation will be conditional on the replacement of a non-organic source of heating of the building. Non-organic heat exchange Actions to raise environmental awareness Organisation of the control systemThe supported projects will result in CO2 reduction by at least 30 for existing installations, there will be a reduction of PM10 emissions by 96.27 and PM2.5 by 91.59.The project does not plan to connect to the local heating network. It is not possible and it will not be possible to connect to the heating network during the period of implementation of the programme, i.e. until 2023 within the scope described in the project.The applicant does not have and does not plan to prepare a cover programme for persons who bear increased heating costs of the premises related to the permanent change of heating system in the area covered by the project. The PGN identified the problem areas identified in the project. The project includes activities that are described as corrective in the PGN, which improve the conditions, i.e. the elimination of low emission sources.