The subject of the project is the replacement of heat sources of old boilers, furnaces, heating appliances for solid fuels in individual households into boilers using solid fuels, new generation, complying with ecodesign rules in the Chełmiec Municipality. There is no possibility of connecting buildings to the district heating network. The project also includes funding for the construction of internal installations in the building necessary for the proper funk. heating system. Priority will be given to RES projects.Project number of these boilers together with modernisation of internal installation in buildings: 113 pcs.Thanks to the implementation of the project, the CO2 emissions by at least 30 from 1876.90 to 1014,65 trok, PM10 from 6.8579 to 0.22057thyear and PM2.5 from 2.8875 to 0.2095 trok. The support will be conditioned by ensuring an appropriate effect. energet. in the building. The buildings covered by the project will meet the energy intensity requirements contained in the SzOOP.The owners of the building will be obliged to submit the building to the energy assessment according to the methodology adopted by IZ and to carry out the energy modernisation of the building. The support will be conditional on the implementation of investments in the development of energy efficiency, reducing energy efficiency.The project also includes providing residents with information on reducing low emissions, saving natural resources and improving energy efficiency. This will be carried out within the framework of promotional, information and educational activities aimed at both children and young people and adults from the municipality. These activities will promote proekol attitudes and a sense of response. for the state of the environment in the above-mentioned scope. All available information channels will be used to promote the project and these topics: Internet, local leaders of priests, mayors, etc., direct meetings, presses, posters, etc. The recipients are local residents. The municipality is not a health resort. There’s no plan for a shield threshold.