The project is located in the center of Krakow in the district XIII Podgórze and assumes the execution and designation of approx. 5,25 km bike paths. Characteristics. sections: from the link bridge. Kazimierz from Ludwinów to ul. Konopnicka in general traffic in ul. Ludwinowska, Długosza, Krasickiego, Mitera no works. Konopnicka section. path and pavement access to the Mateczny roundabout from the side of ul. Mitery on footbike. and bike path. wide. 2.5 m. ul. Kamieńskiego from roundabout to crossroad from street. Insurgents of Silesia independent walks and bicycles. width of the pavement 2.5 m and track 2.0 m. pass through ul. Czyżówka fork within the pavement and the path on the elevated surface. from the link of the Insurgents of Silesian Kamieńskiego to ul. Swoszowicka for pedestrians and cyclists over the road and railway tracks. from ul. ul. Swoszowicka to ul. The path in the form of a contraband is wide. 2.0 m separated from the road by a separator from the crossroads from ul. Puszkarska to the access road to the LPG station on foot cycle. 3.0 m from the access road a bicycle path in the form of a contraband wide. 1.5 m from the access road to the crossroads from ul. W. Sławka section. walking and bike. 2.0 m from ul. W. Sławka to the field staircase common line on foot. o szer. 3.5 m from the stairs to the intersection with ul. It is an independent walk on the street. 2.0 m and bicycle. wide. 2.0 2.5 m project connection. path with istn. within str. Wielicka line on footbike. in ul. Malborska and Wielicka paving structures: pavement cube concrete bike path. asphalt modf. string walking bike. asphalt fashionf.In addition: Bud. and remodel. pedestrian crossings and their access to bike movement. Dostos. is syg. light. Reconstruction of the underground armament network Bud. lighting.The paths are according to the Tech Standards for Infrastr. bike. M. Krakow adopted orders. No 21032004 of the President of the City of Krakow of 26.11.2004