This project covers the implementation of a bicycle path on the west side of al. 29 November, on the section from ul. Iron to St. Opole and additionally on the eastern side of al. 29 November on the section from ul. Iron to the intersection with ul. Welcome to Stoss. Total length of built roads for bicycles Characteristics of sections:Eastern side al. 29 November from St. Iron to St. Welcome to Stwosza The CPR cycle on foot with a width of 3.5 to 4.0 m.West side from ul. Iron to St. Stone cycle path WR 2.5 m. in the area of the CPR service station 3.5 m from the service station to the end of building no.32 ŚR 253,0 m from building No. 32 to the end of the railway viaduct CPR 304,0 m from the railway viaduct to ul. Opole including the bridge on the Białucha ŚR river 2,53,0 mWith each section of a separate cycle path, a sidewalk will be separated from 2.02.5 m wide. The project includes the expansion of the bridge facility over the Bialucha River.The project includes the expansion of the bridge facility on the Białucha River. 2.2 m to extend and guide the cycle path along the pavement. Surface design: Bike path bet. asphalt asphalt bet. asphalt pavement of cube bet. surfaces raised for WR and pavementScope of design and construction works: Preparatory work: demolition, earth; Safety and removal of collisions with existing technical infrastructure; Necessary road infrastructure, i.e. illumination, dehydration, light signalling; Curbs, edges, concrete benches; Surfaces of bicycle paths, pavements, footways, downhill slopes, surfaces with substructures; Scratch protections, resistance structures, bridge structures, terrain stairs; Temporary and fixed traffic arrangements, security and tranquillisation elements; Other elements of land development Full of copyright supervision