The project includes the reconstruction of Kraków Swoszowice station, which will be one of the stops of the SKA Rapid Agglomeration Railway, located in km of 7.092 railway line No.94 Kraków PłaszówOświęcim and the construction of Park Ride parking lot.Reconstruction of the station is aimed at organising a transfer hub which will connect all modes of transport, i.e.: transport by rail, city bus and individual. This will increase the availability of public transport for travellers.The scope of the project includes: demolition of the existing two-line island platform in km 6,9847,184 of railway line No 94; construction of an island platform in km 6,9847,184 of railway line No 94; demolition of existing access to the platform at rail level; construction of the underground passage in km 7,097 railway line No. 94 demolition and reconstruction of track no. 1 and 2 of railway line No. 94 at Kraków Swoszowice station connected with the construction of a new platform and pedestrian crossing under the tracks and demolition of track no. 4 and displacement no. 21; the regulation of existing track Nos 1 and 2; construction of a technological road, access to the platform with the construction of a culvert under the road; reconstruction of the colliding support structures of the overhead contact line resulting from track system correction; demolition, construction and reconstruction of technical infrastructure networks and equipment, including: sanitary and water supply networks, drainage and rainwater drainage networks, electro-ennerget networks, telecommunications networks, railway traffic control networks, construction of toilets with water connections and sanitary sewage systems; construction of a fire tank; construction of the PR car park with the necessary technical infrastructure on number 396, 1142, 1143, 1144, 3421, 3422, 417, 418, 3511 r. 67 Uphills and 6410 rpm. 66 Podgórze marking in accordance with the recommendations on park and ride PR car parks in Krakow Metropolis.The scope of the project also includes design documentation, supervision and promotion of the project.