The subject of the project is the construction of a public cross-country skiing trail in the form of a loop for hiking, marked with uniform signs and equipped with information equipment, which ensures that tourists travel safely and peacefully with any level of skills and experience, at any time of the year and in all weather conditions. The illumination of the route will make it available at any time of the year except for special situations. Construction of the Gorce Klikuszowa run skiing centre The first stage includes the construction of: cross-country trails, track trails eventually, after hardening of the route with bituminous surfaces, resistance walls, bridge over the commune road, snowing, technical installations, rainwater drainage.The bridge over the commune road project is part of the routes provided for in the project, it is dedicated to people using the trail. It is designed for a long-distance track. 947.87 m. The length of the track: 1178.78 m. The track coincides with the cross-country trail in approx. 50.The design of the cross-country track is long. 906.77 m and wide. 6.00 m in the stadium. In the case of the project, the stadium was called the central part of the facility, with cumulative, varied routes. The route was designed in conjunction with the ski slope partly the width of the cross-country trail is part of the width of the track.The route connects with the PTTK trail in Gorczański National Park Klikuszowa Bukowina Obidowska Grube. This will also improve accessibility to other tourist routes located in the GPN. The construction of the complex will improve accessibility to the natural and tourist attractions of the commune.The users of the route will have the opportunity to use the parking lot at the gymnasium in Klikuszowa 40 parking spaces. Users of the route will have access to the facility via lines 3 and 8 of MZK and private buses. In the immediate vicinity of the route there is a bus stop.