The aim of the project is to create a Spatial Recreation Park with a total area of approx. 8950 m² equipped with play equipment, small architecture elements, construction works and hardened surfaces. Several zones are planned to be separated in the Park:General play area for children. pow. 11001500 m².S. limited access area. 8001050 m².S. family climbing. I'm sorry. 200300 m².S. bike area. 16002000 m².S. relaxation. 11001300 m².Skatepark pow. 200350 m².S. outdoor gym area. 500900 m².The manufacturer is obliged to obtain a certificate of compliance of the playground with PNEN 1176 and PNEN 1177 standards.The recreational equipment must have a guarantee period of at least 3 years, should be made of safe and durable materials, in accordance with Polish standards and safety conditions specified in particular in regulations. The recreational park with an emphasis on active family holiday, taking into account the needs of people with disabilities, will diversify the current tourist offer. The planned Park is well-connected: 500 m from the KrakowKrynica national road, there is also a bus stop and car parks for cars and coaches, a bicycle path and a walking route in the immediate vicinity. The infrastructure created as part of the project will be made available all year round.The project will be implemented in a design and build mode, which means that the entire implementation of the investment will be commissioned to one contractor. Project management and promotion of the project and its effects will remain on the MOSiRu side. On the part of the contractor selected by tender, the whole park will be designed and executed in accordance with the PFU. Also at the project stage, contractors will be selected and verified technical parameters of the facilities which are elements of the recreation park as well as architectural assumptions.