The purpose of the investment project is to design and implement construction on the site of the existing chairlift lift Słotwinka together with the equipment and technical infrastructure at the Słotwiny Arena ski station.As part of the planned investment plan, the existing plate lift with a length of 500 m is planned. It is planned to install a single-line railway with circular motion, decoupled, with 6-seat chairs and a wind shield for chairs. The railway is designed for capacity according to technical data and is designed for a capacity of 2400 hours. 100 transport up the route and 33 transport down the route are planned. The length of the slope on the slope will be 390.80 m. Skiing at the lower station takes place through the clock gate, which causes skiers and other passengers to be allowed in appropriate time intervals on the conveyor and chairs by means of time control. The speed of the vehicles in the stations is reduced to approx.1.0 ms in the area of boarding and disembarkation.The described railway is designed according to the latest knowledge of cableway construction, equipped with modern technology and corresponds to Directive 20009EC. 380.90 m long sofa railway with 6 support posts, upper railway station, which consists of a world of top stop with a transition wheel and a wheelhouse, a lower railway station, which includes: the world of the lower stop with a convertible wheel, a cabin and a back-room building.