Extension of ul. An electric roundabout begins at the site of the existing intersection of the street. Tranquil, Electrical and al. Sandy, then will include the reconstruction and extension of the street. Electric, construction of a roundabout on the site of the existing intersection of ul. Electric, Wyszyński and Klikowska Street with reconstruction of the intersection of ul. Klikowska with railway line No. 115 Tarnów Szczucin. The episode is long. 1.484 km. Scope of work:1 Expansion str. Electric in Tarnów for cross-section of two carriages. 2 Construction of intersections with crossroads including 2 roundabouts3 Construction of drainage of roads4 Construction of infrastructures called the road5 Construction of road lighting4 Reconstruction and demolition of the water networks of the waterworks of Tarnowskie Waterworks 5 Reconstruction of the interior and demolition of the network of canal. in the area of the bus stops. collective. long bay bus. in the area where the bicycle paths have been provided are provided for sectional fences separated. stop platform from bike path. This solution is designed to eliminate the accidental situation of pedestrians entering the cycle path of pedestrians arriving at the autob., blocking posts of type U12c preventing vehicles from entering pedestrians and bicycles in a town where such manoeuvre by drivers will be possible.