The project includes the extension of ul. It has a length of approx. 2.375 km from the roundabout at the exit of the A-4 motorway to the intersection with Niewodniczański and Krzyżański streets along with accompanying infrastructure, as well as the promotion of the project. The detailed scope of the construction works to be carried out includes: — extension, construction and reconstruction of roads and sidewalks along with the reconstruction of intersections ul. Myślenicka with streets: Warsaw, Morozewicz, Merkuriusz Polski, Siarczanogórska, Siarczki, Szybisko, Sawiczewskich, Niewodniczański – construction of resistance walls on sections: from km 0 + 392.50 to km 0 + 447.90 and from km 0 + 822.80 to km 0 + 882.50; — reconstruction and construction of exits to the property over the entire length of the requested section; — reconstruction and construction of rain drainage with inspection wells and outlets for receivers, rain drains and connections in the section from km 0-296.00 to km 2 + 069,50; — reconstruction of existing road culverts in the following locations: in km 1 + 300.30, in km 1 + 836.00 and in the section from km 1 + 990.50 to km 2 + 007.40; — reconstruction of ditches on sections: from km 1 + 977.90 to km 1 + 990.50 and from 2 + 007.40 to km 2 + 021.30; — reconstruction and construction of a street lighting network in the section from km 0 + 023.30 to km 2 + 070,45; — reconstruction of light signalling with the construction of induction loops and power supply cables in the section from km 0 + 464.30 to km 564.30; — reconstruction of the interfering electricity grid with connections and the removal of inactive sections of the network on sections: from km 0-033.75 to km 0 + 907.25, from km 0 + 922.70 to km 0 + 923.95, from km 1 + 180.10 to km 1+ 361.80, from km 1 + 717.90 to km 1+729.20, from km 1+925,10 to km 1+ 1,996, from km 996 + 996,996 km to km ⁇ + ⁇, ⁇; — reconstruction of the interfering telecommunication network with connections on sections: from km 0-254.05 to km 0-141.80, from km 0-034.35 to km 0 + 621.20, from km 0 + 755.85 to km 1+ 978.60, from km 2 + 024.10 to km 2+094.30; — reconstruction of the interfering water supply network with connections and liquidation of failures