C.E.U. Tranquil beginning at the intersection of ul. Krzyska and tranquil and ending before the intersection with al. Sandy, includes the total length of time. 854.5 m. Purpose of the buildings covered by the project, including the extension of the road, in the corner: extension of ul. Tranquil in T. for two-way cross-section 2x2; extension of the cross section ul. Krzyska and tranquil with light signal; road drainage construction; refurbishment and demolition of water networks. Tarnowskie Waterworks; refurbishment and demolition of the main water. 50 km from 3,25,2,00,00,2,50,2,00,2,50,3,50,1,5,5,3,25,2,00,2,50,2,2,00,2,50,50,3,50,1,5,1,5,5,3,25,2,00,2,50,2,50,2,00,2,50,50,50,3,50,1,5,3,25,25,2,00,00,2,00,00,2,50,2,2,00,2; 50, 1, 50, 1, 5, 1., 5, 5, 1, 5, 1, 5, 5, 5, 5, 1, 25, 5, 1, 5, 5, 1; 5, 5, 1, 1, 5, 1, 25, 5, 1, 5, 1; 5, 1; 5, 25; 1. 5, 1; 5, 1; 5, 1; 5, 5, 1; 5, 1; 5, 1; 5, 1; 5, 5, 1; 5, 1; 5, 1, 25; 5, 1; 25; 1, 5, 25; 5, 1; 25; 25; 1; 5, 1; 5, 1; 5, 1, 25; 25; 25; 25; 25; 25, 25;1; 5, 1, 25, 1, 5, 1, 1, 25, 1, 5, 1; 25; 1; 5, 5, 25; 25; 25; 25; 25, 1, 5, 1; 5, 1; 5, 1; 25; 25; 25; 25;; 25;;;;;;;;;;;;;;;;;; 50; 1, 5, 1; 5, 1; 5, 1; 5, 1; 25; 25; 25; 25; 25; 25; 25; 25; 25; 25; 25; 25; 25; 25; 25; 25; 25; 25;; 25;; 25; 25; 25; 25; 25; 25; 25; 25;25;;; 25; 25; 25;; 25; 25;25;;;25;25;;; 25; 25;25; 25;25; 25; 25;;; 25;;;; 25; 25; 25; 25; 25;; 25;;;;;;; 25; 25; 25; 25; 25; 25; 25; 25; 25; 25; 25;;;;;;;;;;;; th,; 1st, 50; 1; 5, 1; 25; 25; 25; 25;;; 25; 25; 25; 25; 25; 25;; 25; 25; 25; 25; 25; 25;; 25; 25; 25; 25; 25; 25; 25; 25; 25; 25; 25; 25;; 25; 25; 25; 25; 25; 25; 25; 25; 25; 25; 25; 25;; This solution is designed to eliminate the situation of accidental entry on the cycle path of pedestrians arriving at autob stops.U12c blocking bars preventing vehicles from entering pedestrians and bicycles in places where such manoeuvres by drivers will be possible.