The subject of the project is the comprehensive construction of a communal road starting and ending in the district road no. 18160 2162K, 1830,55 km and 0043,20 km; reconstruction of the district road in kilometre 0006.55 to 0057.00 by extending the road to 6 m; construction of road culverts in km 633233,55 DK7 The new road is to be a one-way road, two-lane, two-way road with a width of 6 m. It is planned to use bituminous pavement with bituminous pavement, containing sidewalks from broken aggregates, and a one-sided sidewalk. reconstruction of 0.0505 km of district road and construction of road culvert 0,0175 km Activities undertaken in the project construction of the municipal road; reconstruction of district road No. 18160 2162K; construction of one-sided pavement with a width of 2.0 m construction of individual exits construction of public exits and renovation of public slides construction of drainage system by construction of rainwater sewage systems construction of concrete elements for drainage of road passages and culverts extension of road culverts fi400 at the stop of public transport to the junction of road no. 714 with cleaning of the colonists concerned the construction of the outlet of the designed sewerage system implementation of the integrations of the municipal road to DP Equalisation to the crossroad DP No.