The project includes the reconstruction of the Chełmek railway station building The factory, together with the development of the adjacent site, will be carried out in a design and construction mode within the scope of the project contractor’s work, will be preparing project and executive documentation and financial statement and obtaining the necessary permits.As a result of the project, 1 railway station will be supported and 1 park facility will be built and 23 parking spaces will be created, including 2 parking spaces for disabled people and 1 bicycles will be built. The possibilities of the area are limited by more parking spaces. The station and the parking lot are located near the active sections of Trzebinia Oświęcim railway line no.93 in the direction of Kraków, where passenger trains are transported, and the infrastructure implemented as part of the project will serve to serve travellers using this line.The project plans to adapt the building to the functions related to passenger traffic and to improve its technical and aesthetic standard. As part of the reconstruction, all rooms include waiting room, toilet, buffet will be available to travellers.The scope of the reconstruction includes: demolition of the roof and its construction and thermal insulation of the roof covering, demolition of parts of existing ceilings, partition walls, floors; dismantling of door and window carpentry and internal installations; construction of the ceiling above the main hall and staircase on the attic, construction, insulation and roof covering, installation of platform for disabled people, construction of existing arcades, installation of door and window joinery, thermal insulation of walls and floors, finishing works, equipment and finishing of rooms, other information is included in section Q.