Kohesio: discover EU projects in your region

project info
Start date: 1 March 2017
End date: 31 October 2019
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 136 783,42 €
EU contribution: 113 366,09 € (82,88%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa Małopolskiego obsługiwany przez Urząd Marszałkowski Woj. Małopolskiego – Departament Zarządzania Programami Operacyjnymi,
intervention field
European Commission Topic

Reconstruction of the parking lot at the station “PKP Niedźwiedź” in the village of Niedźwiedź and Polanowice

The project concerns the reconstruction of the existing parking lot at the active railway station Bear. The station at which the investment is carried out is located at the active section of the railway line, which is connected with the continuous traffic of passenger trains, and the infrastructure built as part of the project will serve the service of railway travellers.The scope of the project includes the construction of PR parking spaces, construction of a manoeuvring area, construction of a pedestrian line with solar lighting. Access to the car park will be provided directly from the commune road, which will be refurbished by the project through the replacement of unqualified expenditure.The planned works concern the construction of infrastructure to support ONLY travellers using rail transport, including ParkRide, BikeRide car parks, construction of transport lines necessary to move travellers to the train or back to the car or bicycle, and the necessary vehicles from the entrance to the parking lot. The parameters of the investment are as follows:Number of seats ParkRide 51 pieces including disabled persons 5 pcsThe surface of parking spaces with concrete paving stone, gr. 8 cm 618.5m2Custom parking space for bicycles 73.5m2The surface of the manoeuvrable space with the ground floor with mineral and asphalt mass, MMA AC 11S 890.0m2Location of the roadway with mineral-asphalt mass

Flag of Poland  Tarnowski, Poland