The project concerns the reconstruction of the existing parking lot at the active railway station Słomniki. The railway station, at which the investment is carried out, is located at the active section of the railway line and what it entails is the continuous traffic of passenger trains, and the infrastructure built as part of the project will serve the service of passengers using the railway bay.As part of the project, the following is planned: construction of parking spaces, construction of a manoeuvre, construction of other transport infrastructures will be used. The investment carried out involves an increase in the value of the fixed assets being built. In the parking lot there are 76 post spaces. for personal PR. Parking spaces are located in such a way as to allow the maximum number of posts to be separated. Along the one-way manoeuvring road with a width of 4.5 m, there are 11 parking spaces, including 2 seats for disabled people, specially marked and located close to the Słomniki station building. During the parking spaces and in the immediate vicinity of Słomniki station, a space was proposed for the installation of special bicycle parking stands. Energy-saving solutions, e.g. solar lamps, are envisaged.In addition to construction works, the project provides for the implementation of: preparatory work, investor supervision and promotion