The subject of the project is the revitalisation of the urban space in Tarnów.The project will consist of the following tasks:1 Regeneration of a historic building located at ul. Market 4. The activities include demolition and construction works, construction of sanitary, electrical and teletechnical installations and equipment for the purpose of Tarnowski Experimental Park.2 Renovation of Municipal Walls in Tarnów on ul. Bernardine in the Little Steps area. The task includes the renovation of the Small Steps and demolition, earth and masonry of the city walls on their eastern and western sides and illumination. Refurbishment of Pl. Kazimierza 3, ul. Short 4, st. Cathedral 5, St. Chapter 6 and Market Plate 7. The tasks include demolition works, construction works including the construction of troughs, substructures, surfaces, pipe replacement, installation and renovation of small architecture, lamp maintenance, green planting, traffic organisation, expert studies and laboratory research and archaeological surveillance. Wałowa 25 with the exposing of the historic half-basket. The task includes demolition, construction and installation works, including reconstruction of cellars, drying and fungation of their walls, construction wall, staircase with conveyor for disabled people, entrance pavilion and ceiling over cellars, as well as the creation of a Multimedia Artistic Centre for the purchase of equipment. 9 Archaeological supervision for tasks no. 3, No.4, No.510 Indirect costs related to project management and promotion.11 Building of the square ul. The actions taken will respond to the diagnosed problems that affect the centre of Tarnów, above all will contribute to bringing order in urban space, improving the technical condition of the infrastructure, eliminating architectural barriers and creating an interesting educational and recreational offer that will revive the old town. The solutions adopted in the project are consistent with the best practices.