As part of the project, there will be a cycle path with a width of 2.50-3.00 m (along the provincial road No. 457 from asphalt concrete and along the district road No. 1807 O – from concrete cube) with the total length of: 3.58 km (including 2.36 km in Popielów commune, 1.05 km in the commune of Dobrań Wielki and 0.17 km in Ozimek commune) and two car parks Bike&Ride: in Popielów for 10 stands and in Dobień Wielkie for 20 racks. As part of the construction of bicycle paths, there will be a foot and bicycle footbridge in the village of Krasiejów on the Mała Panew river with a resistance wall and a foot and bicycle footbridge over the Brynica River. The project also provides for illumination of the bicycle path using LED lamps on the Popielów – Stare Siołkowice section and Stare Siołkowice – Chróścice section.