project info
Start date: 30 August 2016
End date: 16 September 2019
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 10 137 733,60 €
EU contribution: 8 616 863,15 € (85%)
programme
Programming period: 2014-2021
Managing authority: Zarząd Województwa Opolskiego obsługiwany przez Urząd Marszałkowski Województwa Opolskiego, Departament Koordynacji Programów Operacyjnych

Improving accessibility to the junctions of the A4 motorway Gogolin and Olszowa. Stage II. Task 5. Construction of the bypass of Malni and Choruli within the Voivodeship Road No. 423 on the section from km 20 + 846.46 to km 27 + 010.10

The project will be implemented as a new road section, which is the bypass of Malnia and Chorula with the inclusion of the ring road in the existing road system. The beginning and end of the planned route will be in the existing footprint of Voivodeship Route 423. The length of the bypass route will be 6.16 km. Implementation of the planned project will include the construction of the bypass of Malnia and Chorula, the construction of intersections with roads crossing the bypass, the construction of a road viaduct over the existing district road No. 1831O, the reconstruction of the district road 1832O on the section adjacent to the cement plant, construction of a communication line connecting the road connecting the bypass with the DW No. 424 (0.40 km), construction of local roads, construction of roads and services necessary for communication of existing building of the construction of the road with the projected bypass, construction of the elements of the road, construction of the elements of traffic, construction of local roads, plant and service roads necessary for communication of existing building of the construction of the road with the projected bypass, execution of elements of the road, execution of elements of the road, construction of local roads, construction of works and services necessary for communication of existing building of the construction of the road with the design of the road, construction of elements of the road, construction of local roads, factory and service roads necessary for communication of existing building of the construction of the road with the design of the road, construction of elements of the road, construction of the roads of the villages of Malnia and Chorula, construction of intersections with road crossings, construction of roads connecting the road to the existing district No. 1831O, reconstruction of district road No. The project will be carried out together with the full technical infrastructure necessary for the operation and operation of the road route and its users, together with environmental protection devices (acoustic screens, settlers and water separators from the road area), elements affecting road safety (walks, pedestrians, asylums for pedestrians, integration slabs, curb reflectors, islands that slow down traffic, the corresponding type of crossroads, 3 intersections.

Flag of Poland  Opolski, Poland