The subject of the investment is the reconstruction of the Voivodeship Road No. 414 from km 48 + 648 to km54+ 601, together with the construction of a walking-bike path along the entire section of the investment. In the section from km 48+ 648 to km 50 + 204 and from 52 + 748 to km 54+ 601, the investment will take place on the existing trail, while from km 50 + 200 to 52 + 758.64-according to the new kilometre (52+ 730-according to the current kilometre) the road will be followed by a new trail. The scope of the investment includes, among others: extension of DW No. 414, extension of the road body, construction of a new foot-bike line, construction of sideways and pavement, construction of pedestrian crossings, reconstruction of bus bays with a place for shelters, construction of a parking space for travellers, reconstruction and construction of exits and construction of road crossings, road culverts and culverts, roadside ditches, reconstruction and protection of technical equipment of conflicting infrastructure with the design of waterways, construction of road barriers, construction of roadside ditches, reconstruction and security of technical infrastructure with design of the road system, construction of roadways and culverts The project will be implemented together with the full technical infrastructure necessary for the operation and operation of the road route and its users, together with environmental protection devices, elements affecting road safety (walks, cat meshes, asylums for pedestrians, bus bays, protective barriers, active signs, integration boards). The realisation of the investment will result in direct material effects including: length of built voivodship roads 2.55 km, length of reconstructed voivodship roads-3.16 km, number of projects in the field of improving road safety-1 pcs, Detail.description in point. 5.1