The project concerns the reconstruction of roads to investment areas in municipalities: Opole, Dobń Wielki and Tarnów Opole. The material scope includes the reconstruction of roads in 3 locations: Opole, Chróścice and Tarnów Opole. The material scope in Opole includes the reconstruction of road infrastructure within the Industrial Park “Metalchem” (reconstruction of two intersections with DW 423, reconstruction and construction of L and Z class roads with a total length. 6.7 km with walkways and bicycle tracks, construction of parking spaces, reconstruction of the manoeuvring and parking area, construction of turning squares, construction of bus stops and bus loops, demolition of the existing viaduct and construction of new facility in the construction of the ground-shell structure, reconstruction of railway crossings, cutting of trees and shrubs as well as planting, reconstruction and construction of street lighting, reconstruction of the roadway system, reconstruction of trees and shrubs, installation, reconstruction and construction of street lighting, reconstruction of road and cycle tracks, construction of parking spaces, reconstruction of existing manoeuvres, construction of refurbishing sites, construction of bus stops and bus loops, demolition of the existing viaduct, construction of the new building in the ground-shell construction, reconstruction of railway crossings, reconstruction of trees and shrubs, planting, reconstruction and construction of street lighting, reconstruction of railway crossings, logging of trees and shrubs as well as planting, reconstruction and construction of street lighting, reconstruction of roadways and roadways. The material scope in Chróścice includes the reconstruction of communal roads. Onions and Sand. 1.13 km (land heap, road construction and reconstruction, roadside construction, ditch cleaning, green revitalisation, construction of parking spaces, extension of the road lane, correction of arches of crossings, reconstruction of downhills, vertical marking). The material scope in Tarnów Opolski includes the reconstruction of the communal road ul. Św. Jack’s a long shot. 0.98 km (construction and reconstruction of roadways, earthworks, excavations in land, construction of substructures, cleaning of layers). In addition to the above mentioned project costs include copyright and investor supervision, project promotion and indirect costs. Planned products of the project: length of reconstructed municipal roads: 8,81 km, number of projects to improve the safety of road users: 1