The project consists of rebuilding and expanding the street. The National Army on the section from ul. Pułaski to ul. North with a total length of 2.198 km (class G road) in the target route of Voivodeship Road No. 655 in the city of Suwałki. The task includes the construction of roadways with technical infrastructure and intersections with ul. Falka, Wyszyńskiego (rondo), Chopin and St. Northern (rondo). Pavements, bicycle paths, foot and bicycle lines, bus bays with the necessary technical and teletechnology infrastructure, reconstruction of network collisions, road lighting, traffic-free devices, greenery, etc. were also designed. The main objective of the project is to increase transport accessibility of the city of Suwałki and the region and transfer transit traffic outside the historic city centre. The project will improve spatial cohesion in the interregional dimension and improve accessibility and cohesion within the region, as well as better integration of transport infrastructure serving the city and the region as a tertiary node into the TEN-T network. This project will contribute to improving road safety and reducing congestion and congestion and limitations of road capacity. Total value of the project: 19 671 928,27 zł Eligible costs: 19 401 882,25 PLN The amount of ERDF co-financing: 10 311 927,21 PLN Period of implementation of the project: 04.01.2017-30.08.2019 (financial completion of the project).