project info
Start date: 2 October 2017
End date: 31 July 2020
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 2 646 468,38 €
EU contribution: 1 852 527,87 € (70%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa Podkarpackiego obsługiwany przez Urząd Marszałkowski Województwa Podkarpackiego w Rzeszowie, Departamenty odpowiedzialne za: zarządzanie, wdrażanie osi priorytetowych I-VI, obsługę finansową, kontrolę oraz wspomagające wdrażanie
intervention field
beneficiary
European Commission Topic

Support for distributed energy among residents of Jaśliska, Lesko, Rymanów Municipalities

The subject of the project is the design and construction of installations using renewable energy sources in residential buildings in the municipality of Lesko, Jaśliska commune and Rymanów commune. The project will include 243 households in which 276 renewable energy installations will be installed (81 solar collectors, 148 photovoltaic installations, 35 boilers, 12 heat pumps). The project will include 62 households, in which 76 RES installations will be installed (19 solar collectors, 35 photovoltaic installations, 15 boilers, 7 heat pumps). In Rymanów the project will include 483 households, in which 543 renewable energy installations will be installed (182 solar collectors, 263 photovoltaic installations, 98 boilers).This will allow additional production capacity: — electricity from renewable sources = 1,38 [MWe];- thermal energy from renewable sources = 4,68 [MWt].Number of built production units: The direct objective of the project is to increase the level of energy production from renewable energy sources in the distributed generation in the districts of Jaśliska, Lesko and Rymanów.The general objectives are: reduction of pollutant emissions – reduction of air pollution; improving energy efficiency in individual housing – reducing energy supply costs, promoting energy saving attitudes; increasing the responsibility of residents for the state of the environment and air pollution; combating climate change and increasing the resilience of local energy systems to the risks arising from these changes.The project is implemented in partnership of 3 municipalities. Lesko commune will be the leader of the project and in a comprehensive way will ensure the preparation, implementation and coordination of the project.

Flag of Poland  Krośnieński, Poland