project info
Start date: 29 December 2014
End date: 31 December 2017
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 307 442,46 €
EU contribution: 261 326,09 € (85%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa Podkarpackiego obsługiwany przez Urząd Marszałkowski Województwa Podkarpackiego w Rzeszowie, Departamenty odpowiedzialne za: zarządzanie, wdrażanie osi priorytetowych I-VI, obsługę finansową, kontrolę oraz wspomagające wdrażanie
European Commission Topic

Thermal modernisation of public buildings: OSP Dynów at ul. Bartkówka, OSP Dynów at ul. School, Elementary School No. 2 at ul. Bartkówka in Dynowo, building of the Municipal Office in Dynowo

The aim of the project is to improve the efficiency of public buildings in Dynowa to the level of energy-efficient construction with the simultaneous introduction of an energy management system. Within the framework of the project, 4 public utility buildings, i.e. two OSP buildings, Primary School and the Municipal Office building in Dynowo will be thermally modernised. The building of the Municipal Office will include thermal insulation of external and foundation walls as well as thermal insulation of roof over bays. In addition, the door and window carpentry will be replaced, as well as modernisation of the heating inst. by replacing the boiler with the reconstruction of the inst. What. The project will produce energy-saving lighting and a set of micro-sources of RES – photovoltaic installation. OSP building on ul. The school plans include thermal insulation of the ceiling, exterior and foundation walls with the replacement of door and window carpentry. The installation of the boiler with the modernisation of the inst was also planned. Co and CWU. In addition, energy-saving lighting and a set of micro-sources of RES – photovoltaic inst. will be installed. OSP building on ul. Bartkówka – thermal insulation of the ceiling of the last conduit and exterior walls and foundation. together with the replacement of the door and window joinery. In addition, it is planned to install a heating boiler together with the modernisation of the CO and CWU installations as well as the production of energy-saving lighting. In addition, a set of micro-sources of RES – photovoltaic installation will be installed. In building SP no. 2 in the building there will be thermal insulation of external walls and floor floor, replacement of door and window carpentry and replacement of lighting for energy-efficient. To sum up, 4 buildings will be modernised, 3 RES generation units will be built, and 3 heat sources will be modernised.

Flag of Poland  Rzeszowski, Poland