The aim of the project is to improve the energy efficiency of public buildings, i.e. It’s a glass. Podst. in Chmielnik, OSP firehouse in Błędowa Tyczyńska, Szk. Podst. in Wola Rafałowska, People’s House in Wola Rafałowska, Szk. Subst. in Zabratówka and the Fireman’s House in Zaratówka. As part of the project, all above-mentioned buildings will be insulated with thermal insulation of the wall partitions, the lighting for energy-saving buildings will be replaced and a set of micro-sources of RES – photovoltaic installation will be installed. In addition, in the building. It’s a glass. Subst. in Chmielnik – roof insulation, moder. of existing heating ins. together with the boiler will be made and the call doors will be replaced. In the bud. OSP in Błędowa Tyczyńska is planned for isolate floor on the ground, doc. ceiling inside the above-mentioned attic, replacement of windows, luxphery doors and garage gates, heating system for CO and CWU. Bud, it’s Bud. It’s a glass. Podst. w W. Rafałowska – the door and windows will be replaced, zmoder. will be inst. Which, together with the boiler, doc. ceilings above the basement, attic and in the connector. Bud, it’s Bud. The People’s House in W. Rafałowska – plans to isolate floor on the ground, warming of the ceiling above the basement and attic, as well as exchanging doors of call and modern ins. Which, together with the installation of the boiler. It’s a glass. Subst. in Zabratówka – doc. ceiling under the attic, the so-called door and zmoder. will be replaced by the inst. What with the boiler. The Fireman’s House in Zabratówka-, the floor on the ground, the ceiling of the arcade and the ceiling, will be modern. ins. CWU and CO together with the boiler assembly and the external doors and garage door will be replaced. As a result of the project, the conditions of use of the above mentioned buildings will be improved and air quality improved, the costs of energy supply will also be reduced. As part of the project, 6 buildings will be modernised, 6 units of electricity generation from RES will be built, and 6 heat sources will be modernised.