Kohesio: discover EU projects in your region

project info
Start date: 9 June 2016
End date: 31 March 2022
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 7 493 487,57 €
EU contribution: 6 369 464,39 € (85%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa Podkarpackiego obsługiwany przez Urząd Marszałkowski Województwa Podkarpackiego w Rzeszowie, Departamenty odpowiedzialne za: zarządzanie, wdrażanie osi priorytetowych I-VI, obsługę finansową, kontrolę oraz wspomagające wdrażanie
intervention field
European Commission Topic

Improving water and sewage management in the agglomeration of Baran Sandomierski within the framework of the Tarnobrzeg MOF

The agglomeration of Baranów Sandomierski with an equivalent number of inmates of 7 738 was created by the Sejm Wojik. Podkarpackie spp. NoXXVI/464/16 of dn. 29.08.2016.It is located in the locality: Rams Sandomierski, Suchorzów, Dmitri Mały, Skopanie, Wola Baranowska and Knapa from the OŚ in the villages: Rams Sandomierski and Knapa (as a result of the project will be excluded from activity). It’s the Agglom. Rams Sand. is included in the V update of KPOŚK in column: I_d agglomerations, as PLPK045 and I_d treatment plant, as PLPK0450. According to the statistics, at the end of 2015 only 34.3 % of residents of the municipality used the network of can. sanit. The total number of inmates using the can. sanit. network is 4 050 RLM. Sewage drains are discharged to the mech-biologist. Axis Qśd=700 m³/d (RLM=4083) In Sandomierz Baranów (treated sewage is discharged to a row. It is the right-bank tributary of the Vistula River. The scope of works includes:A) Construction of the network kan. sanit. o d³. 52356,36 m (35601,02 m for quaval and 16755,34 m costs for non-quantified costs). It is assumed that one year after the completion of the project, the number of users of the can. sanit. network will increase by 1 570 RLM (within the quarter costs as a result indicator). B) Reconstruction of kan. sanit. o d. 8658.80 m (5000.00 m under the cost of quaval).C) Reconstruction and expansion of the existing OWC in Baranów Sandomierski. As part of the planned break. The axis will reach the target culvert. Qśd=1371.5 m³/d (RLM=9000).In addition, it is assumed to improve and optimise the wastewater treatment process by building new parts and rebuilding existing equipment. In addition, the installation of a photovoltaic system is envisaged to support the power supply of EW devices. The aim of the project is to improve quality and prevent the degradation of Wednesdays by reducing water and soil pollution and protecting natural ecosystems. From a social point of view, it is extremely important to improve the social level and housing of the municipality and the state of the environment.

Flag of Poland  Tarnobrzeski, Poland