the project will also translate into improving the quality of life of residents of the municipality and will increase its attractiveness for residents. Other objectives of the project include: increase the number of places in pre-school education institutions, improve pre-school education conditions, improve the safety of children attending kindergarten as well as pedagogical staff. However, the impact of the project will be much broader – it will also allow for:reduction of territorial deficit in access to pre-school institutions, dissemination of pre-school education. The objectives are in line with the objectives of the ESF, the EP and Council Regulation 1304/2013 of 17.12.2013. The expansion of the school and preschool complex building in a light bulb will consist of the addition of a ground-floor building, walls with styrofoam. .. Roof in the form of a ceiling. Roof cover with heat-heated papa. The width of the facade is 9.0 m, the angle of the stropod is about 3°. Height of the building – up to 3.5 m. Internal installations: electric, water can, gravitational ventilation, C.O. powered from an existing boiler room. Above ground – 51,07 m², area – 44,1 m², cubicle – 250.22 m³, long – 9.37 m, wide – 5.43 m.Adapting work in the Public Preschool in Podborz with playground: preparation of the area through removal of humus and levelling of the square, installation of pendulum swing devices – 1 pcs. carousel -1 pcs, play set 1 pcs, weight swing 1 pcs, toy on spring 1 pcs, sandbox wooden 1 pieces Adaptation of rooms of sanitary rooms and halls for construction work – installation in the scope of replacement of batteries, washbasins, urinals, pavilions and mouth bowls of lungs