Kohesio: discover EU projects in your region

project info
Start date: 18 January 2016
End date: 30 March 2018
funding
Fund: European Regional Development Fund (ERDF)
Total budget: 116 023,52 €
EU contribution: 98 619,98 € (85%)
programme
Programming period: 2014-2020
Managing authority: Zarząd Województwa Podkarpackiego obsługiwany przez Urząd Marszałkowski Województwa Podkarpackiego w Rzeszowie, Departamenty odpowiedzialne za: zarządzanie, wdrażanie osi priorytetowych I-VI, obsługę finansową, kontrolę oraz wspomagające wdrażanie
European Commission Topic

Reconstruction and fitting-out of rooms in the School Complex at School Street in Dynowo

The direct objective of the project is to increase accessibility and improve the quality of educational offer at the basic and secondary level in Dynów Municipality. The general objectives are to increase the attractiveness of the educational offer, increase the effectiveness of educational and educational programmes and reduce disparities and improve the image of the school in the local community. The implementation of the project will also help to reduce the disparity of children’s development opportunities between Dynów Municipality and other urban areas of the voivodship and, in the long term, to improve the level of education of residents. As a result of this project, the condition of the teaching infrastructure in the Municipality of Dynów will be improved by rebuilding the sanitary facilities into the first and second floors of segment “A” (including adaptation for people with disabilities), teaching rooms on the fourth floor of segment “A” and dressing rooms and sanitary facilities at the gym on the first floor of segment “B”. The existing facade of the staircase of the “E” segment will also be rebuilt, increasing the energy efficiency of the building. As a result of the project, smaller rooms will be separated from three classrooms of segment “A” which will significantly improve the standard of revalidation, correction, compensatory activities and so-called interest rings. The reconstruction of the locker room and sanitary facilities at the gym in the “B” segment will improve the technical condition and functionality of the facility. The project also includes the retrofitting of 4 workshops (mathematical, natural, physical and one computer lab) through the purchase of the necessary teaching equipment (693 pieces), including ICT. The purchase of modern teaching equipment will significantly contribute to making the learning process more attractive and effective. To sum up, this project will cover one educational institution with 559 seats.

Flag of Poland  Rzeszowski, Poland