The subject of the project is investment activities aimed at rebuilding the building of the Public School Complex in Lower Basznia together with the reconstruction of the sports hall. In addition, the school team will be equipped with modern ICT equipment and equipped with teaching materials will be a natural laboratory. The implementation of the project will create favourable conditions for the development of the school covered by the project, ensuring at the same time improving the quality and standard of teaching, as well as increasing accessibility to modern teaching methods for children from rural areas of Lubaczów. The achievement of the main objective is possible through the achievement of the specific objectives: — improving the school’s local and sports base; — access to modern scientific aid for children; — improving the energy efficiency of the building; — improving working and working conditions; — reduce the disparities in access to education. As part of the modernisation, it is planned to: the refurbishment of parts of the walls and construction, enlargement of the door holes, partial walling of window and door openings, demolition and construction of staircases, reconstruction of the main entrance, replacement of the wooden carpentry on the windows of the PCV with the replacement of the interior and exterior walls of the interior and exterior walls, the demolition of the staircase and the performance of the staircase in the constructed window window (the ceiling above the cellar and the ground floor),